MODULES / OPERATIONS
BOM Cost Estimate
Read-only bill of materials cost estimates based on current ASKERP inventory valuation.
Overview
| Module id | ask_product_cost_bom |
|---|---|
| Version | 1.0.0 |
| Who uses it | Anyone who uses the screens listed below. |
| Installed | On demand, from Settings → Modules. Anything it needs is installed with it. |
Where to find it
| Manufacturing | BOM cost estimates |
|---|
The menu entries appear once the module is installed and your role allows them.
How it links to other modules
- Needs: Manufacturing, Inventory, Accounting
- Works better with: no other module in particular
- Needed by: no other module
A module that is needed cannot be turned off while the module that needs it is on.
Details
BOM Cost Estimate
Optional port of Odoo's ask_product_cost_bom for ASKERP Manufacturing. It shows the current inventory valuation estimate for each active BOM component and the resulting total and per-output-unit estimate.
This is deliberately read-only. ASKERP values inventory using its perpetual AVCO posting engine; the report derives component unit cost from each component's current on-hand quantity and inventory value. If no quantity is on hand, its cost is shown as unavailable and the total is not presented as complete. Component quantities use their saved product reference UOM; ASKERP does not currently convert units within a BOM.
The module never changes product cost, stock valuation, manufacturing orders or the ledger. Estimates are current-state figures and do not represent a frozen quote or historical production cost. Install from Settings > Modules after Manufacturing and Inventory. All data is company-scoped by PostgreSQL RLS.