MODULES / OPERATIONS

BOM Cost Estimate

Read-only bill of materials cost estimates based on current ASKERP inventory valuation.

Overview

Module idask_product_cost_bom
Version1.0.0
Who uses itAnyone who uses the screens listed below.
InstalledOn demand, from Settings → Modules. Anything it needs is installed with it.

Where to find it

ManufacturingBOM cost estimates

The menu entries appear once the module is installed and your role allows them.

How it links to other modules

A module that is needed cannot be turned off while the module that needs it is on.

Details

BOM Cost Estimate

Optional port of Odoo's ask_product_cost_bom for ASKERP Manufacturing. It shows the current inventory valuation estimate for each active BOM component and the resulting total and per-output-unit estimate.

This is deliberately read-only. ASKERP values inventory using its perpetual AVCO posting engine; the report derives component unit cost from each component's current on-hand quantity and inventory value. If no quantity is on hand, its cost is shown as unavailable and the total is not presented as complete. Component quantities use their saved product reference UOM; ASKERP does not currently convert units within a BOM.

The module never changes product cost, stock valuation, manufacturing orders or the ledger. Estimates are current-state figures and do not represent a frozen quote or historical production cost. Install from Settings > Modules after Manufacturing and Inventory. All data is company-scoped by PostgreSQL RLS.

BOM Cost Estimate | ASKERP Docs